Thank you for working with Greene Fire in 2024. We will be taking a short break for Christmas, starting Monday, 23 December 2024, and will be back to assist you on Monday, 6 January 2025. We wish you a joyful holiday season and a Happy New Year and look forward to partnering with you again in 2025. Thank you for working with Greene Fire in 2024. We will be taking a short break for Christmas, starting Monday, 23 December 2024, and will be back to assist you on Monday, 6 January 2025. We wish you a joyful holiday season and a Happy New Year and look forward to partnering with you again in 2025. Thank you for working with Greene Fire in 2024. We will be taking a short break for Christmas, starting Monday, 23 December 2024, and will be back to assist you on Monday, 6 January 2025. We wish you a joyful holiday season and a Happy New Year and look forward to partnering with you again in 2025.
We will be from Closed for the Christmas Shutdown from Monday 23 December 2024 and will Reopen on Monday 6 January 2025. We will be from Closed for the Christmas Shutdown from Monday 23 December 2024 and will Reopen on Monday 6 January 2025. We will be from Closed for the Christmas Shutdown from Monday 23 December 2024 and will Reopen on Monday 6 January 2025.
×
Get In Touch

    ×
    Get In Touch

      ×
      Get A Free Quote

      Get a Quote

      • Contact Details

        Please provide the information below so we are able to provide you with more accurate pricing.
      • Product Selection*

        Please select your desired products from the lists below
      • Please include sizes and required Fire Ratings

      TECHNICAL ISSUE

      Many office fit outs are incorporating inter-tenancy stairs to benefit from better workflow, communication, to maximise rental / useable area and to achieve higher green star ratings. If the inter-tenancy stair exceeds two floors, fire and smoke management of the opening between the floors is required to comply with Building Code requirements. The Oil Search fit out, in the prestigious and award winning 6 Star Green Star building of 1 Bligh Street adds another dimension to this development featuring a unique spiral stair case in a round inter-tenancy opening from levels 22 – 24.

      GREENE FIRE SOLUTION

      The initial solution compartmentalised the stairs on level 24 on fire alarm activation by incorporating full height curved glazing complete with a wall drenching system. This system could not be used at the opening to the spiral staircase therefore a standard FireMaster® vertical fire curtain with side guides concealed in a custom curved feature was designed as a solution. Coopers Fire realised that whilst this solution would enable the spiral staircase feature it would not compliment this feature or provide maximisation of space and workflow. Greene Fire therefore proposed their revolutionary FireMaster® Concertina™ in a first ever 18 sided polygon arrangement to remove the need for all side guides and columns to provide the full -/120/- fire rating. The end product provides a uniform look, across all 3 levels with their patented round ceiling interface fire curtain, mirroring the spiral staircase opening Additionally Greene Fire’s vertical obstruction sensing system was incorporated to provide an automated system to monitor obstructions. The obstruction system and fire curtain product do not require side guides!

      KEY BENEFITS FOR THIS PROJECT:

      • Only one product and one system is required to achieve the required fire and smoke rating
      • No side guides are required
      • A curved ceiling interface panel fits in with the look and feel of the building and the fitout
      • No compromise on the fire or smoke performance
      • Works correctly with the zone smoke control system