Thank you for working with Greene Fire in 2024. We will be taking a short break for Christmas, starting Monday, 23 December 2024, and will be back to assist you on Monday, 6 January 2025. We wish you a joyful holiday season and a Happy New Year and look forward to partnering with you again in 2025. Thank you for working with Greene Fire in 2024. We will be taking a short break for Christmas, starting Monday, 23 December 2024, and will be back to assist you on Monday, 6 January 2025. We wish you a joyful holiday season and a Happy New Year and look forward to partnering with you again in 2025. Thank you for working with Greene Fire in 2024. We will be taking a short break for Christmas, starting Monday, 23 December 2024, and will be back to assist you on Monday, 6 January 2025. We wish you a joyful holiday season and a Happy New Year and look forward to partnering with you again in 2025.
We will be from Closed for the Christmas Shutdown from Monday 23 December 2024 and will Reopen on Monday 6 January 2025. We will be from Closed for the Christmas Shutdown from Monday 23 December 2024 and will Reopen on Monday 6 January 2025. We will be from Closed for the Christmas Shutdown from Monday 23 December 2024 and will Reopen on Monday 6 January 2025.
×
Get In Touch

    ×
    Get In Touch

      ×
      Get A Free Quote

      Get a Quote

      • Contact Details

        Please provide the information below so we are able to provide you with more accurate pricing.
      • Product Selection*

        Please select your desired products from the lists below
      • Please include sizes and required Fire Ratings

      Project Summary:

      Monash Chancellery University, VIC – One of the largest Concertina Fire Curtains in the Southern Hemisphere was installed in Monash Chancellery University, enabling a large multilevel open space which promotes a cooperative learning and working environment Project: Monash Chancellery University, VIC Builder: Kane Constructions Architect: Arm Architecture Application: Multi-level fire compartmentalisation

      What Is The Client Looking For?

      A 10,000 square metre union of public space, office space, housing, and parking, the new Monash University Chancellery building began construction in 2018. Traditionally, university chancelleries are used as a workplace for the principal administrators. However, this new chancellery is designed as a welcoming ground between senior decision makers and their distinguished visitors. The Chancellery has been constructed by Kane and opened for the beginning of the university year in 2020. Monash’s Clayton Campus, where this Chancellery resides, is a treasure trove of 20th Century architecture which has been incorporated by ARM Architecture into the design of the campus’ newest addition. With the decorative and functional lattice shaped façade, the Chancellery naturally fits into the overall aesthetic of the campus. Internally, the Chancellery’s most distinctive feature is the clerestory ceiling, a traditional architectural feature with a modern aesthetic. Multiple large atrium spaces framed by mass timber balustrades connect the floors, allowing the light from the clerestory to shine through the whole building. In order to maintain the free flow of light and achieve fire safety standards, a fire curtain that won’t obstruct the space needed to be incorporated into the design.

      The Problem?

      The atria are large and consist two complexed bubble shaped circular openings with an interconnecting walkway in between to connect both sides of the floor together for easy access. Consideration must be made to closely follow the contours of the balustrading for compartmentation whist allowing occupants to egress safely off the walkway.

      How Did We Help?

      While light can be spread through the atrium voids of the Chancellery, fire and smoke can easily spread too. To prevent the spread through the levels and funnel the smoke through the top of the building, a 72 lm Greenefire FireMaster Concertina with 32 facets and laser cut capping to match the contours was incorporated into the design. In the event of a fire, the Concertina curtain will deploy and create a fire barrier around the voids on level 3 separating this level from the rest of the levels, effectively turning it into its own room not considered part of that level. This allows the building to achieve code as no more than two levels are directly connected to one another without a barrier in place. With a timed ‘Split Drop Delay’ system to allow egress under the curtain in alarm mode, and battery back-up to stop nuisance deployment on power outages, our curtain is the second longest in the world and is certainly considered to be one of the most complexed fire curtains ever installed. The Concertina is the perfect choice for this situation due to its ability to contain multiple facets so not to interrupt the flow of the building. With the use of the FireMaster Concertina, the Chancellery met fire safety requirements and maintained the complex architectural goals of the building.