Thank you for working with Greene Fire in 2024. We will be taking a short break for Christmas, starting Monday, 23 December 2024, and will be back to assist you on Monday, 6 January 2025. We wish you a joyful holiday season and a Happy New Year and look forward to partnering with you again in 2025. Thank you for working with Greene Fire in 2024. We will be taking a short break for Christmas, starting Monday, 23 December 2024, and will be back to assist you on Monday, 6 January 2025. We wish you a joyful holiday season and a Happy New Year and look forward to partnering with you again in 2025. Thank you for working with Greene Fire in 2024. We will be taking a short break for Christmas, starting Monday, 23 December 2024, and will be back to assist you on Monday, 6 January 2025. We wish you a joyful holiday season and a Happy New Year and look forward to partnering with you again in 2025.
We will be from Closed for the Christmas Shutdown from Monday 23 December 2024 and will Reopen on Monday 6 January 2025. We will be from Closed for the Christmas Shutdown from Monday 23 December 2024 and will Reopen on Monday 6 January 2025. We will be from Closed for the Christmas Shutdown from Monday 23 December 2024 and will Reopen on Monday 6 January 2025.
×
Get In Touch

    ×
    Get In Touch

      ×
      Get A Free Quote

      Get a Quote

      • Contact Details

        Please provide the information below so we are able to provide you with more accurate pricing.
      • Product Selection*

        Please select your desired products from the lists below
      • Please include sizes and required Fire Ratings

      Project Summary:

      Horizontal Fire Curtain With No Visible Supports: By incorporating Coopers FireMaster® NVS™ horizontal fire curtain barriers on levels 2 & 4 the voids are able to be closed in fire mode. This reduces the compartment size to within the BCA requirements for Type A construction of not more than two interconnected floors, a floor area of less than 8,000m2 and office volume less than 48,000m3. Project: 4 National Circuit, ACT Developer: Lend Lease Architect: Fender Katsalidis Fire Engineer: Arup Application: Atrium

      Technical Issue

      The aesthetic design of each building includes a void similar to an atrium which interconnects 6 levels. This allows for introducing more natural light in to the building and increasing the opportunity for people to interact and share ideas. These features of the building add favourably to the 5 Star Green Office Design v3 target achievement for the project. As there are 6 levels interconnected through the void, the large floor area and volume created this means that the building is required to meet the atrium provisions in Part G of the BCA. This is a very costly and restrictive in design.

      Greene Fire Solution

      By incorporating the FireMaster® NVS™ horizontal fire curtain barriers on levels 2 & 4 the voids are able to be closed in fire mode. This reduces the compartment size to within the BCA requirements for Type A construction of not more than two interconnected floors, a floor area of less than 8,000m2 and office volume less than 48,000m3. This means that the building does not have an atrium in fire mode. Two 9 meter wide by 17 meter draw NVS™ models were installed in the West building. These are the largest horizontal fire curtains installed in the world with No Visible Supports and achieve an FRL of -/120/-!

      Key Benefits For This Project:

      • NVS™ – No Visible Supports within the atrium void
      • Cost saving on atrium construction requirements
      • Cheaper solution than vertical fire curtains on multiple floors
      • Reduced maintenance costs with less curtains and no supports in the void
      • Allows points for Green Star ratings
      • Light weight construction does not require structural steel to support it