Thank you for working with Greene Fire in 2024. We will be taking a short break for Christmas, starting Monday, 23 December 2024, and will be back to assist you on Monday, 6 January 2025. We wish you a joyful holiday season and a Happy New Year and look forward to partnering with you again in 2025. Thank you for working with Greene Fire in 2024. We will be taking a short break for Christmas, starting Monday, 23 December 2024, and will be back to assist you on Monday, 6 January 2025. We wish you a joyful holiday season and a Happy New Year and look forward to partnering with you again in 2025. Thank you for working with Greene Fire in 2024. We will be taking a short break for Christmas, starting Monday, 23 December 2024, and will be back to assist you on Monday, 6 January 2025. We wish you a joyful holiday season and a Happy New Year and look forward to partnering with you again in 2025.
We will be from Closed for the Christmas Shutdown from Monday 23 December 2024 and will Reopen on Monday 6 January 2025. We will be from Closed for the Christmas Shutdown from Monday 23 December 2024 and will Reopen on Monday 6 January 2025. We will be from Closed for the Christmas Shutdown from Monday 23 December 2024 and will Reopen on Monday 6 January 2025.
×
Get In Touch

    ×
    Get In Touch

      ×
      Get A Free Quote

      Get a Quote

      • Contact Details

        Please provide the information below so we are able to provide you with more accurate pricing.
      • Product Selection*

        Please select your desired products from the lists below
      • Please include sizes and required Fire Ratings

      Project Summary:

      FireMaster Fire Curtains The Solution For Monash University Library: Greene Fire FireMaster curtains are used for fire separation of the stairs and level 1 atrium. Builder: Hansen Yuncken Architect: Cox Architecture Fire Engineer:Aecom Sector:Education Application: Compartmentation

      Technical Issue

      Monash University has transformed their Sir Louis Matheson Library to a new state of the art learning resource and library centre. After the original library was opened back in 1964, Cox Architects were engaged to design a new and vibrant resource extension to the original library. The existing library consist of 3 buildings which were constructed in 5 stages over a 30-year period. Building 4 North Central Library, was the first to be erected and following on from this later that decade was Building 4 South Main Library. The last to be built, building 67, was erected in the 1990’s. A series of linking structures connect the 3 buildings across the site which required additional fire protection solutions to allow for the new construction.

      Greene Fire Solution

      To provide safe and clear exit routes whilst limiting the spread of fire, three fire curtains were installed to provide compartmentation of level 1 atrium and to provide fire separation of the level 2 stairs. Fire curtains are tested and assessed to AS1530.4 with an FRL of – / 120 / – fire resistance level as required under BCA clause C3.15.

      Key Benefits For This Project:

      • The curtains have been suspended above complex designed ceilings and installed to drop between a predetermined gap, with the side guides recessed into the walls so not to impede the building design and character.
      • Using fire curtains throughout the library allows for wide open plan areas to be created but still providing code compliance via a performance based solution.
      • The use of multi roller vertical curtains allowed some of the outer walls to be used as a structure for fixing the fire curtain and guides, as well as providing the greatest floor area and open space available.